Arama Sonuçları Building—Superintendence. - Daraltılmış: Engineering economics.SirsiDynix Enterprisehttps://katalog.hacettepe.edu.tr/client/tr_TR/default_tr/default_tr/qu$003dBuilding$0025E2$002580$002594Superintendence.$0026qf$003dSUBJECT$002509Konu$002509Engineering$002beconomics.$002509Engineering$002beconomics.$0026ps$003d300?dt=list2024-11-29T23:57:12ZJapanese Contractors in Overseas Markets Bridging Cultural and Communication Gapsent://SD_ILS/0/SD_ILS:4838662024-11-29T23:57:12Z2024-11-29T23:57:12ZYazar Suzuki, Kazuhito. author. Sui Pheng, Low. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.1007/978-981-13-7244-5">https://doi.org/10.1007/978-981-13-7244-5</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>Construction Quality and the Economy A Study at the Firm Levelent://SD_ILS/0/SD_ILS:4832612024-11-29T23:57:12Z2024-11-29T23:57:12ZYazar Sui Pheng, Low. author. Shing Hou, Lau. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.1007/978-981-13-5847-0">https://doi.org/10.1007/978-981-13-5847-0</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>Construction Productivity in the Multilayer Subcontracting System The Case of Singaporeent://SD_ILS/0/SD_ILS:4839322024-11-29T23:57:12Z2024-11-29T23:57:12ZYazar Sui Pheng, Low. author. Jia Zheng, Sim. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.1007/978-981-13-1831-3">https://doi.org/10.1007/978-981-13-1831-3</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>Effective Front-End Strategies to Reduce Waste on Construction Projectsent://SD_ILS/0/SD_ILS:4844562024-11-29T23:57:12Z2024-11-29T23:57:12ZYazar Rundle, Peter G. author. Bahadori, Alireza. author. Doust, Ken. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.1007/978-3-030-12399-4">https://doi.org/10.1007/978-3-030-12399-4</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>Performance-Based Contracts for Road Projects Comparative Analysis of Different Typesent://SD_ILS/0/SD_ILS:4876212024-11-29T23:57:12Z2024-11-29T23:57:12ZYazar Gajurel, Ashish. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.1007/978-81-322-1302-4">https://doi.org/10.1007/978-81-322-1302-4</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>Lean Construction Management The Toyota Wayent://SD_ILS/0/SD_ILS:4879812024-11-29T23:57:12Z2024-11-29T23:57:12ZYazar Gao, Shang. author. Low, Sui Pheng. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.1007/978-981-287-014-8">https://doi.org/10.1007/978-981-287-014-8</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>Risk Management for Engineering Projects Procedures, Methods and Toolsent://SD_ILS/0/SD_ILS:4868712024-11-29T23:57:12Z2024-11-29T23:57:12ZYazar Munier, Nolberto. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.1007/978-3-319-05251-9">https://doi.org/10.1007/978-3-319-05251-9</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>