Arama Sonuçları Scheduling. - Daraltılmış: Business planning.
SirsiDynix Enterprise
https://katalog.hacettepe.edu.tr/client/tr_TR/default_tr/default_tr/qu$003dScheduling.$0026qf$003dSUBJECT$002509Konu$002509Business$002bplanning.$002509Business$002bplanning.$0026pe$003dd$00253A$0026ic$003dtrue$0026ps$003d300?dt=list
2024-10-20T22:43:58Z
Behavioral Operations in Planning and Scheduling
ent://SD_ILS/0/SD_ILS:192318
2024-10-20T22:43:58Z
2024-10-20T22:43:58Z
Yazar Fransoo, Jan C. editor. Waefler, Toni. editor. Wilson, John R. editor. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="http://dx.doi.org/10.1007/978-3-642-13382-4">http://dx.doi.org/10.1007/978-3-642-13382-4</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>
Computational Intelligence in Integrated Airline Scheduling
ent://SD_ILS/0/SD_ILS:189352
2024-10-20T22:43:58Z
2024-10-20T22:43:58Z
Yazar Grosche, Tobias. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="http://dx.doi.org/10.1007/978-3-540-89887-0">http://dx.doi.org/10.1007/978-3-540-89887-0</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>
Perspectives in Modern Project Scheduling
ent://SD_ILS/0/SD_ILS:165968
2024-10-20T22:43:58Z
2024-10-20T22:43:58Z
Yazar Józefowska, Joanna. editor. Weglarz, Jan. editor. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="http://dx.doi.org/10.1007/978-0-387-33768-5">http://dx.doi.org/10.1007/978-0-387-33768-5</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>
Planning and Scheduling in Manufacturing and Services
ent://SD_ILS/0/SD_ILS:172095
2024-10-20T22:43:58Z
2024-10-20T22:43:58Z
Yazar Pinedo, Michael L. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="http://dx.doi.org/10.1007/978-1-4419-0910-7">http://dx.doi.org/10.1007/978-1-4419-0910-7</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>
Planning and Scheduling in Manufacturing and Services
ent://SD_ILS/0/SD_ILS:165363
2024-10-20T22:43:58Z
2024-10-20T22:43:58Z
Yazar Pinedo, Michael L. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="http://dx.doi.org/10.1007/b139030">http://dx.doi.org/10.1007/b139030</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>
Project Management with Dynamic Scheduling Baseline Scheduling, Risk Analysis and Project Control
ent://SD_ILS/0/SD_ILS:334945
2024-10-20T22:43:58Z
2024-10-20T22:43:58Z
Yazar Vanhoucke, Mario. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE(334945.1)<br/>Elektronik Erişim <a href="http://dx.doi.org/10.1007/978-3-642-40438-2">http://dx.doi.org/10.1007/978-3-642-40438-2</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>
Project Management with Dynamic Scheduling Baseline Scheduling, Risk Analysis and Project Control
ent://SD_ILS/0/SD_ILS:195867
2024-10-20T22:43:58Z
2024-10-20T22:43:58Z
Yazar Vanhoucke, Mario. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="http://dx.doi.org/10.1007/978-3-642-25175-7">http://dx.doi.org/10.1007/978-3-642-25175-7</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>