Arama Sonuçları Time study. - Daraltılmış: Construction Management.SirsiDynix Enterprisehttps://katalog.hacettepe.edu.tr/client/tr_TR/default_tr/default_tr/qu$003dTime$002bstudy.$0026qf$003dSUBJECT$002509Konu$002509Construction$002bManagement.$002509Construction$002bManagement.$0026te$003dILS$0026ps$003d300?dt=list2026-04-02T19:19:37ZRecent Advances in Structural Engineering and Construction Management Select Proceedings of ICSMC 2021ent://SD_ILS/0/SD_ILS:5268762026-04-02T19:19:37Z2026-04-02T19:19:37ZYazar Hau, Kong Kian. editor. Gupta, Ashok Kumar. editor. Chaudhary, Sandeep. editor. Gupta, Tanmay. editor. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.1007/978-981-19-4040-8">https://doi.org/10.1007/978-981-19-4040-8</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>Proceedings of the 21st International Conference on Industrial Engineering and Engineering Management 2014ent://SD_ILS/0/SD_ILS:5305832026-04-02T19:19:37Z2026-04-02T19:19:37ZYazar Qi, Ershi. editor. Shen, Jiang. editor. Dou, Runliang. editor. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.2991/978-94-6239-102-4">https://doi.org/10.2991/978-94-6239-102-4</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>Risk Management in Architectural Design Control of Uncertainty over Building Use and Maintenanceent://SD_ILS/0/SD_ILS:5293022026-04-02T19:19:37Z2026-04-02T19:19:37ZYazar Martani, Claudio. author. SpringerLink (Online service)<br/>Yer Numarası ONLINE<br/>Elektronik Erişim <a href="https://doi.org/10.1007/978-3-319-07449-8">https://doi.org/10.1007/978-3-319-07449-8</a><br/>Format: Elektrnik Kaynak<br/>Durum Çevrimiçi Kütüphane~1<br/>