Monitoring Tools for Setting up the Hospital Project Initial Planning, Building and Equipment
tarafından
 
Garg, Ajay. author.

Başlık
Monitoring Tools for Setting up the Hospital Project Initial Planning, Building and Equipment

Yazar
Garg, Ajay. author.

ISBN
9789819962037

Basım Bilgisi
1st ed. 2023.

Fiziksel Tanımlama
XXVII, 622 p. online resource.

İçerik
Chapter 1 Planning -- Chapter 2 Detailed Project Report (DPR) & Techno Commercial Feasibility Report (TCFR) -- Chapter 3 Building Area Of The Hospital -- Chapter 4 Schematic Designing & Contract Documents -- Chapter 5 Civil Construction Works Of The Hospital Building -- Chapter 6 Electrical Works Of The Hospital Building -- Chapter 7 Water Supply And Drainage Works Of The Hospital Building -- Chapter 8 HVAC (Airconditioning) Works Of The Hospital Building -- Chapter 9 Fire Safety Works Of The Hospital Building -- Chapter 10 ELV, ICT, IBMS And Information Technology Works Of The Hospital Building -- Chapter 11 Piped Medical Gas Supply System (MGPS) Of The Hospital Building -- Chapter 12 Construction Works Outside The Main Building -- Chapter 13 Ancillary Activities & Implementation -- Chapter 14 Equipment Planning, Procurement And Management -- Chapter 15 Department-Wise Equipment Detailing -- Chapter 16 ManpowerPlanning, Hospital Committees & Staff Policies -- Chapter 17 Policies And Standard Operating Procedures (SOP).

Tüzel Kişi Ek Girişi
SpringerLink (Online service)

Elektronik Erişim
https://doi.org/10.1007/978-981-99-6203-7


KütüphaneMateryal TürüDemirbaş NumarasıYer Numarası[[missing key: search.ChildField.HOLDING]]Durumu/İade Tarihi
Çevrimiçi KütüphaneE-Kitap522107-1001ONLINEElektronik Kütüphane